A and B together can complete a work in 21 days. If A takes 42 days to complete the work alone, how many days will B take to complete the same work alone?
(A) 32
(B) 42
(C) 27
(D) 36
A and B take the responsibility of doing a work for Rs 250. A can do that work alone in 5 days and B alone in 15 days. They complete the work in 3 days with the help of C. If everyone gets paid in proportion to the work, then how much amount will C get?
(A) Rs. 50
(B) Rs.100
(C) Rs. 150
(D) Rs. 200
A, B, and C alone can do a work in 40 days ,120 days and 36 days respectively. A and B work together for 20 days and leave it incomplete. C carries on the work and complete it alone. How many days did C take to complete the work?
(A) 18
(B) 12
(C) 20
(D) 16
A can do
(A) 6 days
(B) 8 days
(C) 5 days
(D) 4 days
A and B working together, can do a piece of work in
(A) 3 hours
(B) 2 hours
(C) 2.5 hours
(D) 1 hours
(E) None of these
A and B together can do a certain work in x days. Working alone, A and B can do the same work in (x+8) and (x+18) days, respectively. A and B together will complete
(A) 12 days
(B) 8 days
(C) 10 days
(D) 9 days
Sudhir and Shyam can do a work in 12 days, while Shyam alone can complete it in 30 days. In how many days can Sudhir complete that work alone?
(A) 20 days
(B) 18 days
(C) 28 days
(D) 30 days
The ratio of two numbers is 5 : 11. If both numbers are increased by 10, the ratio becomes 7 : 13. What is the sum of the two numbers?
(A) 80
(B) 32
(C) 48
(D) 160
The ratio of the sides of a triangle is
(A) 52 cm
(B) 48 cm
(C) 44 cm
(D) 40 cm
The ratio of the students of one school is 3: 5 with the students of the other school, if in the first school there were 50 students more and in the second there were 80 students less then the ratio would be 5: 6. Find the total number of students in both schools.
(A) 600
(B) 800
(C) 400
(D) 250
Get the Examsbook Prep App Today