If 6 men and 8 boys can do a piece of work in 10 days and 26 men and 48 boys can do the same in2days, then the time taken by 15 men and 20 boys to do the same type of work will be
5 921 5df9f2271d67d356b4b630c6
Q:
If 6 men and 8 boys can do a piece of work in 10 days and 26 men and 48 boys can do the same in2days, then the time taken by 15 men and 20 boys to do the same type of work will be
- 15 daysfalse
- 24 daystrue
- 36 daysfalse
- 47 daysfalse