Rahul can do a work in 20 days. Rahul and Shyam together do the same work in 15 days. If they are paid Rs. 400 for that then what is the share of each.
(A) Rs 300, Rs 100
(B) Rs 200, Rs 200
(C) Rs 250, Rs 150
(D) Rs 350, Rs 50
A can do a work alone in 30 days. He left after doing half the work. If B alone can complete the entire work in 16 days, then how many days will B take to complete the remaining work?
(A) 9
(B) 6
(C) 8
(D) 12
A work could be completed in 100 days by some workers. However, due to the absence of 10 workers, it was completed in 110 days. The original number of workers was
(A) 100
(B) 110
(C) 55
(D) 50
A and B take the responsibility of doing a work for Rs 250. A can do that work alone in 5 days and B alone in 15 days. They complete the work in 3 days with the help of C. If everyone gets paid in proportion to the work, then how much amount will C get?
(A) Rs. 50
(B) Rs.100
(C) Rs. 150
(D) Rs. 200
Gopal and Ravi contracted a work for Rs 480. If Gopal can do that work in 15 days and Ravi can complete that same work in 10 days. He completed this work with Mahesh in 5 days, then tell me how much money Mahesh got.
(A) Rs.80
(B) Rs.120
(C) Rs.160
(D) Rs. 40
Some persons can do a piece of work in 12 days. Two times the number of such persons will do half of the work in
(A) 5 days
(B) 3 days
(C) 9 days
(D) 6 days
A and B can do a piece of work in 28 and 35 days respectively. They began to work together but A leaves after sometime and B completed remaining work in 17 days. After how many days did A leave?
(A) 8
(B) 7
(C) 14
(D) 9
Get the Examsbook Prep App Today